SOCKS MANUFACTURER TURKEY · PRIVATE LABEL & OEM
sales@elbasocks.com
EN
ELBASOCKS

ELBASOCKS · ISTANBUL

Manufacturing Quote

Request a manufacturing quote from ELBASOCKS for your private label sock project. Start with your name, email, quantity and project details. Add a logo or technical PDF if available. Orders start from 500 pairs; the product allocation and schedule are confirmed in your quotation.

LET’S TALK PRODUCTION

Let’s build
your next
collection.

Tell us your plans. Share the details you have, and let us know what still needs developing.

500 pairsMinimum starting order1 million pairsMonthly production capacity
sales@elbasocks.com ↗
Cihangir Mahallesi
Güldünya Sokak No: 3
Avcılar, Istanbul, Türkiye
Find our address ↗

Tell us about your project

Start with your name, email, quantity and a short message. Add artwork or more details if you have them.

PDF, PNG, JPG or WEBP. Up to 3 files; 2 MB per file, 5 MB in total. Files are emailed to our sales team, not added to the public media library.

Add company or technical details (optional)

Your request is sent to sales@elbasocks.com. This is an inquiry, not a purchase commitment.

Your manufacturing quote: what to include

A useful quote starts with a useful brief. Select your category, estimate the quantity and describe the material, sizes and packaging. Our minimum order is 500 pairs. If you are still developing the range, tell us what is decided and what you need help specifying.

Visit or contact ELBASOCKS

Email: sales@elbasocks.com. Address: Cihangir Mahallesi, Güldünya Sokak No: 3, Avcılar, Istanbul, Türkiye. Please arrange a visit with our sales team in advance.

Describe the product you want to develop

Tell us who will wear the socks, what they are used for and which shoes they are intended to accompany. Add the preferred height, material, size range and any cushioning or grip requirement. If you have a reference product, explain the features you want to retain and what should change. A clear written description makes a visual reference more useful.

Give us a proposed quantity breakdown

Enter at least 500 pairs in the form and describe how you would like the order divided across designs, colours and sizes. The accepted breakdown is confirmed during quotation. Identify your first-order quantity separately from any longer-term forecast. This helps us review the immediate brief while understanding the collection’s intended scale.

Include branding and packing requirements

Share whether you need knitted logos, custom colours, single-pair labels, wraps, multipacks or another presentation. Provide barcode and carton requirements if these are already defined. Tell us which packaging decisions remain open. Relevant composition, sizing and care information should be reviewed alongside artwork before final approval.

Tell us your destination and target timing

Specify the delivery country and your preferred arrival window. If you use a particular shipping arrangement or warehouse process, include that information in the project details. Development, sampling, approvals and production must be considered together when agreeing a schedule. We confirm timing for the specific order rather than applying a single lead time to every product.

Request the right documents for your sourcing team

List any certificates, audit information, product tests or buyer protocols your company requires. Identify the destination market and the claims you expect to use on the product. Documentation should be reviewed against the relevant entity, current validity and scope. Send these requirements at the beginning so they can be considered with material selection and product development.

What happens after you send the form?

Your inquiry is saved privately in the website administration and passed to the email system for sales@elbasocks.com. The sales team can review the brief and clarify the details needed for a quotation. Submitting the form is a request for a manufacturing discussion; it does not place an order or commit either party to a price or production schedule. You can also contact the same sales address directly.

Plan your manufacturing brief

Share your intended use, target customer, material preferences, size range and quantity. Minimum orders start at 500 pairs; the design, colour and size allocation is confirmed during quotation. Specify your destination market and required testing so the project can be reviewed as a complete product.

Use our manufacturing inquiry form, explore private label production or read the sock tech pack guide. For compliance information see quality and certifications.

For the official explanation of textile harmful-substance testing, see OEKO-TEX STANDARD 100. Programme information does not replace reviewing the current certificate and product scope for your order.

Your manufacturing quote should identify the product specification, proposed quantity allocation, packaging and delivery arrangements being reviewed. Ask for clarification if a manufacturing quote leaves a requirement open; a clear scope helps both teams understand the next approval step.

Manufacturing quote: six details that help us review your request

  1. The intended wearer, category and sales channel.
  2. Proposed sock height, construction and material blend.
  3. Sizes, colours and the total quantity in pairs.
  4. Artwork, logo placement or a reference sample.
  5. Labels, selling units and packing requirements.
  6. Delivery destination and any required arrival date.

Your quote request does not need a completed technical pack. Send the information you know and identify the choices still open for development. A clear product brief helps us connect the proposed sock with your intended customer and presentation, rather than quote a product whose details have not been agreed.

Manufacturing quote — Logo and artwork reference illustration
Logo, pattern placement and colour references.
Manufacturing quote — Product specification checklist illustration
Construction, sizes, materials and quantity.
Manufacturing quote — Retail packaging reference illustration
Approved labels, selling units and carton requirements.

Keep the product brief and quotation connected

Give each proposed version a reference when you ask for alternatives. If a material, cushion layout, artwork or pack format changes, request confirmation against that revised product brief. Keep the chosen sample and packing artwork together when approving the final offer. A manufacturing quote should identify the product being proposed and the commercial scope being reviewed.

For a quote request with a fixed event date, distinguish the required arrival date from a proposed production completion date. Include any warehouse receiving or inspection instructions with the product brief. Sample preparation time and production timing are confirmed for your actual specification and the current schedule.

After sending your quote request

Check that your business email address is entered correctly. The inquiry and accepted attachments are sent to sales@elbasocks.com. This form starts a manufacturing discussion; it is not a purchase commitment. You can also email the sales team directly and identify the product brief or previous inquiry reference you want reviewed.

The minimum starting order is 500 pairs, with the feasible design, colour and size allocation confirmed in the quotation. The sample fee is deducted from the first production order. Keep these project terms with your approval record so the next step is based on the same agreed specification.

Request a quote ↗